Yarudeyskoye field

NOVATEK launched commercial production at the Yarudeyskoye oil field on 1 December, 2015. The Yarudeyskoye oil field is developed by Yargeo (NOVATEK - 51% and Nefte Petroleum Limited - 49%). Daily production level of the Yarudeyskoye oil field is equivalent to approximately 3.5 million tons of crude oil on an annualized basis.

Thirty-six (36) production wells have been drilled and the field’s infrastructure includes a central oil treatment facility, oil and gas gathering systems, a pumping station, and crude oil and gas pipelines linking the field to the trunk pipeline systems.